Installation and Usage Steps of Guide Clamps
Publish Time:
2024-12-03
Linear guide rail The installation and usage steps of the clamp are as follows:
Installation steps:
• Installation timing: The clamp should be installed Linear guide rail after the slider is installed. It is recommended to install it between two sliders.
• Pre-installation: Install the clamp in the unclamped state Linear guide rail and make sure it can move without contacting the clamping mechanism and the rail.
• Pre-tightening and fixing: Hand-tighten the hexagon socket screw of the clamp and temporarily fix it on the slider.
• Adjustment and testing: Perform clamping action Linear guide rail Repeat clamping and releasing more than 10 times to ensure the clamp works properly.
• Final fixing: With the clamp clamped to the rail, use a torque wrench to tighten the bolts to the specified torque. Release the clamp and check that the clamping structure does not contact the rail (this can be checked by pushing the slider back and forth and comparing whether the friction force increases).
• Check connections: Finally, check for leaks in the air pipe or oil pipe connections.
Usage steps:
• Connect the pressure supply: Connect the clamp to the air pipe or oil pipe and ensure that the connection is tight and leak-free.
• Clamping operation: As needed, clamp the rail with pneumatic or hydraulic pressure to fix the slider position.
• Release the clamp: When the slider needs to move, stop supplying pneumatic or hydraulic pressure to release the clamp, and the slider can move freely along the guide rail freely.
• Daily maintenance: Regularly check the working condition of the clamp, including whether the connection parts are leaking and whether the clamping effect is good, to ensure that the clamp is always in the best working condition.
Please note that different brands such as THK guide rail slider 、 KEITE HTPM guide rail slider, HIWIN guide rail slider, AirTAC guide rail slider may have slight differences in installation and use, so please refer to the specific product instructions for actual operation.

Clamping, bull, guide rail, slider, installation, connection, status, check, linear guide rail
Latest News
Get a Free Consultancy
No. 39, Life Second Road, Dalian Economic and Technological Development Zone, 8-5
Copyright © 2025 Maoming Precision Machinery (Dalian) Co., Ltd. All Rights Reserved.
2025-01-08